Project Overview
A specialized sturgeon cultivation facility located in Baku, Azerbaijan, designed for commercial sturgeon production.
Production Capacity
60 tons of sturgeon annually
Location
Baku, Azerbaijan – strategically positioned to serve both local and export markets.
Implementation
Project implementation targeted for 2022, currently in preparatory work stage with design and engineering completed.
